Sunday, November 29, 2009

Manufacturing pictures :

By now we have completed the car structure, the conveyor belt module.
We made all the L brackets required to put the car shell together, attached the dual motor to the car. Used E clips for the top axle. E-poxyed the top wheel to the top axle.

The link to the updated schedule is : http://bit.ly/5XGRD2


Add Image

Saturday, November 21, 2009


Manufacturing update :
Attached the wheels to conveyor belt / Axle , mounted axle on to car.
Lasercutted the sides on front of car
Inserted the Conveyer arm

Testing for MS7:
Used temporary wheels and belts

Thursday, November 19, 2009


We manufactured four parts :
  1. The conveyer belt arm (waterjet)
  2. The bottom of the car shell ( laserjet)
  3. Wheels (laserjet)
  4. Axles ( Lathe + bandsaw)

Thursday, November 12, 2009

Worked on the Motors , learned how to assemble them and tested them.

Thursday, November 5, 2009

Completed the MCM on Solidworks for Ms6