By now we have completed the car structure, the conveyor belt module.
We made all the L brackets required to put the car shell together, attached the dual motor to the car. Used E clips for the top axle. E-poxyed the top wheel to the top axle.
The link to the updated schedule is : http://bit.ly/5XGRD2
Saturday, November 21, 2009
Manufacturing update :
Attached the wheels to conveyor belt / Axle , mounted axle on to car.
Lasercutted the sides on front of car
Inserted the Conveyer arm
Testing for MS7:
Used temporary wheels and belts
Thursday, November 19, 2009
We manufactured four parts :
The conveyer belt arm (waterjet)
The bottom of the car shell ( laserjet)
Wheels (laserjet)
Axles ( Lathe + bandsaw)
Thursday, November 12, 2009
Worked on the Motors , learned how to assemble them and tested them.