Sunday, November 29, 2009

Manufacturing pictures :

By now we have completed the car structure, the conveyor belt module.
We made all the L brackets required to put the car shell together, attached the dual motor to the car. Used E clips for the top axle. E-poxyed the top wheel to the top axle.

The link to the updated schedule is : http://bit.ly/5XGRD2


Add Image

No comments:

Post a Comment